From 4a859f31b8711dc7a370caaa5423def86f6d57b1 Mon Sep 17 00:00:00 2001 From: Julian Appel Date: Fri, 31 Jul 2026 08:59:12 +0200 Subject: [PATCH] Complete protected circuit group phase --- docs/spec/08-current-product-backlog.md | 2 +- .../09-distribution-board-components-and-protection-groups.md | 4 ++-- 2 files changed, 3 insertions(+), 3 deletions(-) diff --git a/docs/spec/08-current-product-backlog.md b/docs/spec/08-current-product-backlog.md index 22004c5..69046fb 100644 --- a/docs/spec/08-current-product-backlog.md +++ b/docs/spec/08-current-product-backlog.md @@ -44,7 +44,7 @@ requirements and intended sequencing, not proof of implementation. - [x] Single-circuit moves between same-category groups with automatic next-free BMK assignment. - [x] Populated-group delete warning and explicit subtree deletion. - [x] Phase E: editor projection and editing. -- [ ] Phase F: documentation and full GUI verification. +- [x] Phase F: documentation and full GUI verification. - [ ] Keep full electrical sizing and cable-dimensioning rules separate until the planner supplies the calculation requirements. - Detailed specification: diff --git a/docs/spec/09-distribution-board-components-and-protection-groups.md b/docs/spec/09-distribution-board-components-and-protection-groups.md index 9a7c56c..c3df4f2 100644 --- a/docs/spec/09-distribution-board-components-and-protection-groups.md +++ b/docs/spec/09-distribution-board-components-and-protection-groups.md @@ -806,8 +806,8 @@ Acceptance: ### F. Documentation and Full Verification -Status: Documentation and automated verification complete; GUI checklist -pending. +Status: Complete. Documentation, automated verification and the agreed GUI +checklist are complete. - update current architecture, API and interaction documentation - update the safe local demo-data instructions; no versioned customer-like