Add public building project setting

This commit is contained in:
2026-07-31 17:41:30 +02:00
parent 43a3bb0b69
commit 44b6fde940
29 changed files with 2057 additions and 54 deletions
@@ -14,12 +14,18 @@ Future suggestions or checks may include:
- cable type
- number of cores
- cable cross-section
- halogen-free cable or line requirement for public buildings
- minimum cable cross-section based on current
- maximum permissible cable length based on voltage drop
- warning messages if cable length, cross-section or protection device do not match
Users must remain able to manually override suggestions.
The project-owned `isPublicBuilding` setting is the authoritative input for
the later halogen-free selection rule. The setting is persisted now; this
document does not yet define or implement the complete cable catalog or sizing
algorithm.
## Initial Design Rule Examples
These are common planning defaults, not a replacement for full norm-compliant calculation.